subject
Mathematics, 02.12.2019 22:17 jacksoneaton

Abicycle manufacturing company makes a particular type of bike. each child bike requires 4 hours to build and 4 hours to test. each adult bike requires 6 hours to build and 4 hours to test. with the number of workers, the company is able to have up to 120 hours of building time and 100 hours of testing time for a week. if c represents child bikes and a represents adult bikes, determine which system of inequality best explains whether the company can build 5 child bikes and 15 adult bikes in the week.

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 03.02.2019 05:40
Given ab and cb are tangents of p, and m =10°. what is the measure of abp?
Answers: 3
question
Mathematics, 02.02.2019 21:41
Questions 9-10. use the table of educational expenditures to answer the questions. k-12 education expenditures population indiana $9.97 billion 6.6 million illinois $28.54 billion 12.9 million kentucky $6.58 billion 4.4 million michigan $16.85 billion 9.9 million ohio $20.23 billion 11.6million 9. if the amount of k-12 education expenses in indiana were proportional to those in ohio, what would have been the expected value of k-12 expenditures in indiana? (give the answer in billions rounded to the nearest hundredth) 10. use the value of k-12 education expenditures in michigan as a proportion of the population in michigan to estimate what the value of k-12 education expenses would be in illinois. a) find the expected value of k-12 expenditures in illinois if illinois were proportional to michigan. (give the answer in billions rounded to the nearest hundredth) b) how does this compare to the actual value for k-12 expenditures in illinois? (lower, higher, same? )
Answers: 1
question
Mathematics, 02.02.2019 21:40
For the past 5 years frank and peggy have deposited 15000 in a retirement account with a simple rate of 7 %.they plan to continue to make annual deposits for the next 20 years. how will their money grow over time.
Answers: 2
question
Mathematics, 02.02.2019 20:30
Acertain academic department at a local university will conduct a research project. the department will need to hire graduate research assistants and professional researchers. each graduate research assistant will need to work 26 hours per week on fieldwork and 14 hours per week at the university's research center. each professional researcher will need to work 11 hours per week on fieldwork and 29 hours per week at the university's research center. the minimum number of hours needed per week for fieldwork is 162 and the minimum number of hours needed per week at the research center is 135. each research assistant will be paid $297 per week and each professional researcher will be paid $458 per week. let x denote the number of graduate research assistants hired and let y denote the number of professional researcher hired. the department wants to minimize cost. set up the linear programming problem for this situation.
Answers: 1
You know the right answer?
Abicycle manufacturing company makes a particular type of bike. each child bike requires 4 hours to...
Questions
question
Computers and Technology, 13.01.2020 20:19
question
Business, 13.01.2020 20:19
Questions on the website: 6713915